if you’re going to dig up streets and sidewalks replacing water mains and lines using cold patch on sidewalks is sub optimal. And what’s more galling is you filled trenches where you laid new line with concrete but sidewalk cuts with cold patch?
It’s bad enough the PWSB has dug up half the city of Providence at this point. But if you dig it up , put it back the way you found it. Is that so hard?